Skip to main content
DistrictCampusDirectory
CAMPUS

Restoring Excellence CPS Bond

 

The Board of Education is asking the community to consider a 2.7-million-dollar bond issue on February 9th, 2021 to restore excellence to Chickasha Public Schools. This is part II of the Restoring Excellence initiative which endeavors to provide district-wide improvements, remodeling, repairing, and upgrades to our school buildings and facilities.

The district began part I of restoring our district to excellence this summer with a roof replacement on the activity center. The district is investing 4.4 million, received from insurance claims, to repair roofs and other facility items. Part II continues district-wide improvements to address identified building, facility, and site issues. The table below outlines the bond projects planned with proposition #1 and proposition #2 of the Restoring Excellence CPS Bond Part II.

Proposition #1

District-Wide

Acquire technology equipment and technology related items district-wide as needed and as funds allow

 

$120,000

Acquire instructional materials and equipment district-wide as needed and as funds allow

 

$100,000

Acquire school furniture, fixtures, and equipment district-wide as needed and as funds allow

 

$30,000

Acquire food service equipment to be used in the District Central Kitchen located in Chickasha High School

 

$36,000

Acquire maintenance equipment to be used throughout the district as needed and as funds allow

 

$40,000

Lincoln

Construct, furnish, equip, and/or acquire improvements to include, but not be limited to:

  • Drainage improvements

 

$214,000

High School

Construct, furnish, equip, and/or acquire improvements at to include, but not be limited to:

Building façade improvements

  • Sidewalk and paving improvements
  • Building accessibility improvements
  • Signage improvements

 

$250,000

Athletic Buildings

Construct, furnish, equip, and/or acquire improvements at Myers Field House to include, but not be limited to:

  • Drainage improvements  

 

$20,000

 

Construct, furnish, equip, and/or acquire improvements at Memorial Stadium to include, but not be limited to:

  • Concrete improvements

 

$150,000

General Building Improvments

All remaining bond proceeds will be utilized for the purpose of acquiring or improving school sites, constructing, repairing, remodeling and equipping buildings, and acquiring school furniture, fixtures and equipment

 

$245,000

Management and support contracts and bond issuance-costs

 

$40,000

Total Proposition #1

$2,295,000

Proposition #2

Transportation

Acquire transportation equipment and auxiliary transportation equipment to include, but not be limited to school buses, small transportation buses, and an activity bus

 

$405,000

Total Proposition #2

$405,000

 